Steel Toes

LOCATION: Fort St. John, BC

CLIENT: Steel Toes
ARCHITECT: Faction Architecture Inc.
CONSTRUCTOR: WL Construction Ltd.
COMPLETED: June 2023
SIZE: 11,870 sq.ft.

Scroll to explore

About the Project

Steel Toes new retail building was delivered via Design-Build, where WL Construction engaged Faction Architecture Inc. in the design and construction of the new space. The building consists of 8,000 sq.ft. of retail space, including merchandising areas, change rooms, point of sale and a future coffee bar area, as well as adjacent office space and 2,300 sq.ft. of warehouse space, on a 0.9 acre lot in central Fort St. John. The exterior cladding was pre-cast structural insulated panels, painted to match the Client’s logo and branding, with aluminum frame entrances and storefront windows.

The interior was designed with an industrial feel including sealed concrete floors, metal shelving, exposed ceilings with accent lighting and feature walls with bright logos reinforcing the store branding. The new building is a big upgrade from the existing store allowing for much more space and future growth for the company.

Get In Touch